DUMSOR Alert: Ghana To Experience 14-Days Power Crisis From Monday (DETAILS)

The Ghana National Gas Company (GNGC) has announced a planned maintenance shutdown of its processing plant at Atuabo in the Western Region.

According to the Company, the shutdown is to allow engineers to undertake routine maintenance on the facility to help improve its capacity of continuous productivity as well as prolong its lifespan.

dumsor alert
DUMSOR Alert: Ghana To Experience 14-Days Power Crisis From Monday (DETAILS)

A statement issued by the Company on Friday, October 1 noted that the shutdown was to have taken 48 days but key stakeholders including Tullow Oil, ENI, Volta River Authority (VRA) and MLE have put in place measures to have it last 14 days.

“During the maintenance shutdown, there shall be an installation of High Integrity Pressure Protection System (HIPPS) and maintenance works on the replacement of Small Bore Piping (SBP), Heat Exchangers (HEX) cleaning, replacement of damaged Product Cooler, replacement of defective valves and re-calibration of all our Safety Critical Equipment including Pressure Safety Valves (PSVs).”

Further added:

“The key benefit of this shutdown is to enhance operability and reliability of our processing and transportation infrastructure.”

“The Board, Management and Maintenance team of Ghana Gas wishes to assure all its stakeholders that we will be working with our partners to ensure system stability during the shutdown period and minimize the impact on the power supply.”

Source: OccupyGh.com 

Tap To Join Our WhatsApp Community

Elisha Opoku-Fosu: Elisha Opoku-Fosu is a final year student of the University of Ghana, pursuing a degree in Fine Arts. Elisha is a fascinating celebrity writer. I also find local politics interesting and have plans of taking up a political task in the near future. You can contact me on Phone: +233242067933 or Email me on: ElishaOPF@gmail.com