OccupyGh.com has sighted a ‘Dumsor’ timetable reportedly released by the Electricity Company of Ghana (ECG).
According to the timetable, they will be an irregular flow of power in some places in the capital from February 11 to 5 March 2021.
OccupyGh.com has gathered that this is as part of the ECG Financial and Operational Turnaround (EFOT) project in collaboration with the Millennium Development Authority (MIDA).
The project will render interruptions in power supply to interconnect load from the Pokuase Bulk Supply Point (BSP) to the Kanda and Airport Substations.
This aims at improving reliability in power supply in these areas.
The areas affected will include; Roman Ridge, Parts of Airport Residential, Air Site Hotel, Primrose Palace and its environs, ECG Roman Ridge District Office, Accra Girls, Mamobi, Kotobabi Poli Clinic, Ghana Institution of Engineers, Ebony, Abavana Down, Kotobabi Down, Modex Filling Station, Alajo, Tobinco Pharmaceuticals and Parts of Tesano.
Check out the screenshot of the timetable below or visit OccupyGh.com for more stories.

Source: OccupyGh.com
Tap To Join Our WhatsApp Community

Warning: Undefined variable $user_ID in /home/occupygh/public_html/wp-content/themes/zoxpress/comments.php on line 51
You must be logged in to post a comment Login